I wanted to post about spreading 24 ton of 2B (3/4") stone at the campground. I used my Massey 1655 with the Johnson front end loader. I think overall time was around 3.5 to 4 hours. It was a little tedious but it was still fun. I did it on a work night on the way home from work. Probably would have been more enjoyable doing it on the weekend. Here is a pic or it didn't happen