Hello all,
My dam at work has been under construction for 7 years, work is just about done, so we're ramping up getting ready to open the campground back up. I've been dropping and processing dead trees, filled two, 40 yard dumpsters with rotten timbers, replacing those, replacing retaining walls, adding gravel to sites, had a new transformer and 400a panel put in, and running electric to an additional 12 sites. Been getting a lot of seat time in the excavator and backhoe.
Still have to wait for the contractor to leave to replace split rail fencing and add to the playground.
Pretty busy.
Thanks,
bobcat2
My dam at work has been under construction for 7 years, work is just about done, so we're ramping up getting ready to open the campground back up. I've been dropping and processing dead trees, filled two, 40 yard dumpsters with rotten timbers, replacing those, replacing retaining walls, adding gravel to sites, had a new transformer and 400a panel put in, and running electric to an additional 12 sites. Been getting a lot of seat time in the excavator and backhoe.
Still have to wait for the contractor to leave to replace split rail fencing and add to the playground.
Pretty busy.
Thanks,
bobcat2