Even though there was standing water in low spots in the driveway, the 4 tons of gravel I ordered was right on time this morning at 9am. That doesn't go very far but that was all we could afford right now. Me and the MF8E got about a 4 hour workout spreading and smoothing. Tractor only had one incident but I'm darn tired. Hand shoveled four yard cart loads and hauled them to smaller areas that needed some help, then worked on getting everything fairly leveled off. The muffler broke around the factory attachment but it's weldable. I just need to go get the welder bottle filled. Stopped after the first pile was flattened out somewhat, filled with gas and I drank some water then right back after it again. Done about 2pm and had lunch. Should have kept the shop door shut with all the leaves that blew in!
DAC